Construction of Turnkey Projects

Turnkey projects, or biogas plant constructions, are realized by our experienced onsite team to meet up to our detailed engineering and Chinese construction standards. In order to offer local pricing, we purchase specific standard equipment locally, such as concrete, piping and cable material, and works. Installation is jointly done by our experienced onsite specialists and assembly team. Special imported key equipment is installed by our German Engineering team to assure reliable operation with low maintenance over a long period of time.

The specialist team comprises of multi-disciplinary personnel of process, electrical, biological commissioning and startup professionals, whom are present throughout the project: from the first dig into the earth until the commissioning and start up of the biogas plant with all the connected equipments.